• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

SBRU

  • Home
  • Documents & Resources
        • Protein Prep
          • Before you begin
          • Biochemistry & assays
          • Crystallography
          • Electrophoresis & gel staining
          • Immunoassays & immunological techniques
          • Liquid handling
          • Protein expression & cloning
          • Protein purification techniques
        • Chromatography
          • Affinity chromatography
          • Gel filtration chromatography
          • HPLC
          • Hydrophobic interaction chromatography
          • Ion-exchange chromatography
          • Reversed Phase chromatography
        • Manuals
          • All manuals
          • IMAGIC-5
          • “O”
          • Pymol
          • Spider
        • Other Resources
          • Student Resources
          • Useful Structural Biology Links
        • Book MCB Equipment

  • Structural Biology Coursework
  • Research Projects
  • People and Publications
  • About the SBRU
    • Events
    • MCB Bookings
    • Contact Us
    • Sitemap

Engage the spring loaded lever and place the gel cassette assembly on the gray casting stand gasket. Insure the horizontal ribs on the back of the Casting Frame are flush against the face of the Casting Stand and the glass plates are perpendicular to the level surface. The lever pushes the Spacer Place down against the gray rubber gasket. Repeat the above steps for a second gel.

28 September 2015 |

Engage the spring loaded lever and place the gel cassette assembly on the gray casting stand gasket. Insure the horizontal ribs on the back of the Casting Frame are flush against the face of the Casting Stand and the glass plates are perpendicular to the level surface. The lever pushes the Spacer Place down against the gray rubber gasket. Repeat the above steps for a second gel.

Engage the spring loaded lever and place the gel cassette assembly on the gray casting stand gasket. Insure the horizontal ribs on the back of the Casting Frame are flush against the face of the Casting Stand and the glass plates are perpendicular to the level surface. The lever pushes the Spacer Place down against the gray rubber gasket.
Repeat the above steps for a second gel.

Primary Sidebar

Contact Us

021 650 2817
trevor.sewell@uct.ac.za

Copyright © 2025 · Genesis Sample on Genesis Framework · WordPress · Log in